September 10, 2012

The big push (on house renovations)

We're making progress.

Why the big push to get stuff done, besides the obvious "I'm tired of living in half a home"?  Because my whole family will be here at the end of the month to throw us a baby party, which means we need a functioning upstairs to manage all of us as they stay and our party guests!  The timeline is shortened a bit because Todd leaves for elk camp the week before everyone's arrival.  So, we effectively have about 1.5 weeks left to get 'er dun.  

Let's do a walk through!

Here is the front entry.  Looking pretty good!  Todd and I came up with the tile pattern and then he cut and laid all that tile himself.  I'm so proud of him!  Don't mind the dusty footprints on it though.  It's just the way things are around here until we get the drywall dust up.  Let's see what's behind that door...


That would be our back hall.  That first room there will be Little Kittel's...


Here we are looking in her room!  Very soon (hopefully) it will not look like this.  Currently, it is being used as construction storage and until this last weekend was a guest room.  That furniture has mostly been carted downstairs to one of the two pending guest rooms that will be down there...


Unfortunately, we won't have time to reno her room before she arrives.  Technically, what is happening in the master bedroom should happen in here.  But we figure we'll wait until she wants pink or rainbow painted walls and attack this room then.  Until then, we'll just grind out the cracks in the plaster, fill them, and then simply paint.  And we'll all have to live with the horrid ceiling tiles with glitter flecks...


That turquoise paint sample on the right is the color her room will be!


Ok, let's keep movin' down the hall.  That's the bathroom on the left, then the master at the end...


The bathroom.  As expected, this room is taking us the longest.  We're getting so close!  But still lots left to do.  The mudding and sanding on the drywall will be done in here tonight/tomorrow (fingers crossed).  Then it's on to texturing, priming and painting with our new fabulous paint sprayer! Todd's friend Ken scraped the thinset out of the cracks in the tile over the weekend, to prepare it for grouting and sealing.  The toilet needs moved in, Todd needs to finish his vanity project, and I need to figure out how to keep the claw foot tub project chugging along.  The wainscoting also needs painted (with that awesome sprayer) and installed.  We will likely not have a working shower in here by the time my family arrives, but toilet and sink should be a go!


This blue will be the color of the bathroom, but probably knocked down about 25-50 percent to lighten it up  just a tad...


And the master bedroom.  Not much to sand in here!  Just the seams on the walls and ceiling and the closet. Then it's texture, prime and paint and we're IN!   


Here is the tub project.  I have gotten all the paint off the inside and now am working on the outside, which is a CHORE.  There isn't just one layer of paint.  There is a layer of paint and some kind of adhesive under it which nearly refuses to budge.  I have been coating it with paint stripper, scraping and blasting it with the pressure sprayer and...nothing.  At least precious little to show for it anyway.  Ugh.    


Keep checking things off my three-mile long to do list!  